News

Missed our seminar, please check


Join our seminar 2015


Seminar

With local session in:
Drammen (NO) June 16th
Poznan (PL) June 23rd
Uithoorn (NL) June 23rd


First crops planted

First crops planted!

First crop


Pilot built started

Poznan pilot is on its way
see our news section:

Poznan pilot


Video pitch


Lindum Pilot Results

The results of the Lindum pilot will be presented at http://www.ihc2014.org/program.html, proof of re-use of organic waste into new food!


Featured on our Twitter account

We just sold our next project! Proud to be part of education for the future of Røyken, Norway

BBBLS, Røyken, Norway, public school, project

BBBLS and Lindum will join Det Magiske Fabrikken in Rygg, Norway

A consortium with Vesar, Grevebiogas, Skalleberg Gartneri, Kjar gartneri, Lindum and BBBLS will built a large testsite in Rygg, Tonsberg Norway to demonstrate and scale-up the food-2-waste-2-food process and the BBBLS technology.

More info at:
Greve biogas
Skalleberg gartneri
Kjar gartneri

Det Magiske Fabrikken

Det Magiske Fabrikken

Forskningsradet

BBBLS is supported by the Norwegian Research council.

Contract signing

Contract signing

Poznan pilot progress

week 22 container

week 22 container

week 22 tomatoes

week 22 tomatoes

week 17 roof filling

week 17 roof filling

week 17 tomatos and half BBBLS

week 17 tomatos and half BBBLS

week 3 Philips HPS lamps on

week 3 Philips HPS lamps on

Thanks to Lek Habo

week 15 ready for crops!

week 15 ready for crops!

Generators installed

Generators installed

poznan pilot week 47

poznan pilot week 47

week 43 2

week 43 2

Status week 43, roof closed, structure almost ready

Poznan week 44

Poznan week 44

Outside ready

Poznan week 39

Poznan week 39

Poznan week 40

Poznan week 40

Poznan arrival of VDH Goods

Poznan arrival of VDH Goods

Poznan equipment container

Poznan equipment container

Site preparations

Site preparations

First dirt

First dirt